** TENTATIVE PRE-ORDER **
- Deposit: RM170 (Japan/Oversea Ver.)
- Release Date: Q3 2025 (subject to possible delay/reschedule)
- ETA: ~4 weeks from actual stock distribution
- LR521/SR521SW batteries x3pcs required (SOLD SEPARATELY)
- Ultraman Gaia V2 shown SOLD SEPARATELY!!
- ORDER DEADLINE: 30TH NOVEMBER 2024
- Series: Ultraman Gaia (1998~1999)
- Height: ~165mm
- Materials: PVC, ABS, Lycra, POM, LED & Magnet
- Packaging: Dedicated art box, mint & sealed (MISB)
CONTENTS:
- Main body x 1 unit
- Interchangeable left wrists x 3 types
- Interchangeable right wrists x 5 types
- Agul Slash effect part x 1 type
- Photon Crusher effect part (with replacement face part) x 1 type
- Agul Saber effect part x 1 type
- Agul Stream effect part x 1 type
- Photon Screw effect part x 1 type
- Agulater x 1 unit
- Agulater stand x 1 unit
- Dedicated display stand x 1 set
- Ultraman Gaia's Photon Edge effect part (BONUS) x 1 type
SHIPPING & HANDLING:
- RM10 within Peninsular
- RM20 to East Malaysia (Sabah/Sarawak)
- Local couriers (Tracking provided once item is shipped)
All about PRE-ORDER:
- Kindly pay attention on ORDER DEADLINE stated for each item, orders placed before deadline SECURE price & slot while those after deadline would NOT be entertained.
- Items marked with "TENTATIVE PRE-ORDER" are those with uncertain release date/availability, which subject to CHANGES/DELAY/RESCHEDULE, actual release date SOLELY depends on manufacturer. These items can be ordered as per any regular PO items & we shall inform buyer as soon as possible once we've gained the exact information or procure sufficient slot.
- Pre-Order price shown is FIXED, except there is noticeable/massive fluctuation on currency exchange rate.
- Submission of DEPOSIT AMOUNT stated is required for order confirmation, meanwhile balance & postage will be collected accordingly upon stock arrival.
- Deposit collected is NOT refundable (excluding supplier's stock cut/slot shortage cases). In the case of slot shortage, PO items will be distributed base on FIRST COME FIRST SERVE basic.
- Failure of clearing the balance within TWO WEEKS from informed date will lead to deposit forfeiture.
- ETA (estimated time of arrival) stated serves as a reference only, actual date/time varies, subject to manufacture/supplier arrangement, shipping time, Customs clearance etc.
×